Stillwater Lift Bridge to re-open
Posted by Bikeverywhere, May 15th, 2020The Stillwater Lift Bridge will reopen to pedestrians and bicyclists in June. Final repairs are being done on the bridge now and a trail along the St. Croix River connects downtown Stillwater to the Hwy 36 Bridge. No need to climb the big hill to get out of town! The trail splits into an upper and lower trail next to Hwy 36. Both are good trails, but the lower one is closer to the river and quieter than the upper trail.
The new trail will be part of a June update to the mobile Twin Cities Bike Map.